Skip to content

Abu Dhabijev novi rig

09.12.2010

Abu Dhabi rig

It has no doubt been a challenging month for us, and it doesn’t seem like long ago that we were drifting in the Med, deliberating whether to sail to Cape Town or not with the new rig being held vertical by old rigging. The logic of shipping prevailed, and no one has regretted it since; especially considering how many stars aligned in order for us to be back sailing this afternoon. Logistically, we had a massive effort from everyone. From our CEO, Jamie Boag, literally getting his hands dirty putting Azzam on the ship in Lisbon, to Craig Satterthwaite’s maticulous oversight of the new rigging when being made in Spain and finally installed in Cape Town. Each member of the team has had to put in a bit extra than what they had probably originally bargained for. But as lead boat builder Ben Davis said to me yesterday, “that’s the nature of the beast with the Volvo, and it wouldn’t be a rush without it”.

Advertisement

From → More

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.